Commercial EIFS Inspections — Virginia Beach & Hampton Roads

Every layer, verified before it’s closed in.

We inspect exterior insulation and finish systems at the stages that matter — substrate, drainage plane, insulation board, mesh embedment, and finish — so defects get caught while they’re still cheap to fix.

1,240+Facades inspected
ASTM E2570Standard referenced
48 hrReport turnaround
Fig. 01 — EIFS Wall Assembly, Section View Interactive
01 02 03 04 05 INTERIOR EXTERIOR
01 / 05

Substrate

Sheathing is checked for fastening pattern, moisture content, and surface flatness before any material goes over it — the single hardest defect to fix once the wall is closed.

1,240+
Facades inspected
6,800+
Moisture probe readings logged
97%
Defects caught before finish coat
48hrs
Report delivery, standard
Scope of Work

Four inspection stages, one continuous record.

Each stage produces a dated, photographed report tied to the wall section it covers — so the paper trail matches the wall, not the other way around.

INS 01

Pre-installation substrate

Sheathing fastening, flashing details, rough openings, and moisture content confirmed before the water-resistive barrier goes on.

Stage 1
INS 02

Drainage plane & attachment

WRB laps, flashing integration, and adhesive or mechanical attachment pattern verified against the manufacturer’s approved detail set.

Stage 2
INS 03

In-progress QA — mesh & coat

Insulation board joints, mesh embedment, base coat mil thickness, and lap seams checked panel by panel as work proceeds.

Stage 3
INS 04

Final survey & certification

Infrared and probe moisture survey of the completed wall, sealant joint review, punch list, and stamped closeout report.

Stage 4

Final Survey

A probe grid tells you what a walk-by can’t.

We run a moisture meter across a gridded pattern on every elevation and log each reading. Anything above threshold gets flagged, photographed, and cut open before we sign off — not after the tenant calls about a stain.

Within threshold Flagged for review
How an inspection runs

Booked to closeout, in four visits.

Timed around your framing and coating schedule — we don’t hold up the crew, we just show up before the layer disappears.

Day 0
01

Site walk & scope

We review drawings, manufacturer specs, and site conditions with the GC before the first board is set.

Per elevation
02

Staged inspections

Substrate, drainage plane, and mesh/coat checks scheduled around your installer’s actual progress.

At completion
03

Moisture survey

Full-elevation probe grid and infrared scan once the finish coat has cured.

48 hrs after
04

Report & certification

Photographed, stamped report delivered to ownership, GC, and the installer of record.

Inspections referenced against —
ASTM E2570 ASTM C1397 ICC-ES AC219 EIMA Guide Spec Manufacturer Detail Sets
Work Order

Request an inspection.

Give us the project and the stage you’re at — we’ll come back with availability and which of the four inspection stages applies.

Response timeWithin 1 business day
Coverage areaCommercial & multifamily
Report formatPDF, photo-logged
No obligation — scheduling only.